Contacts by Division

Infrastructure

The Infrastructure Division administers Texas Parks and Wildlife Department's Capital Program. Through the Infrastructure Division, the department annually bids hundreds of construction projects statewide ranging from $10,000 to $10 million.

Branches of Infrastructure

Six branches make up the Infrastructure Division. Each branch has its own distinct areas of responsibility.

Administration/Finance:

Acts as the Division Comptroller and is responsible for supporting the Division and Agency by providing financial, personnel, and administrative services such as purchasing and records management. The Administration/Finance Branch consists of two sections - Records Management Section and the Budget & Finance Section.

Field Operations:

Provides field-based construction management, and in-house inspection, survey and construction services. The crews are highly skilled in repair and renovation of department facilities and historic structures.

Contracting:

Provides full service contracting support for design and construction services.

Project Management:

Provides Capital Program project delivery, customer service, road and paving project coordination, and project scheduling.

Planning and Design:

Provides the agency with professional planning, architecture and design, landscape architecture, master planning, and engineering services for new, retrofit, and repair projects. The branch also provides professional review services for other branches and divisions within the agency.

Support Services:

Responsible for headquarters maintenance, fleet management program, radio management, risk management program, and energy program.

TPWD Projects

TPWD projects include major repairs and new construction of buildings, utilities, site work, and restorations at various state parks, fisheries, wildlife management areas, field offices, and other facilities all over the state. Additionally, Infrastructure is responsible for all professional design projects for the department.

Bidding/Bonding

Requirements for construction contracts vary depending on the estimated cost of the project:

Insurance

Insurance is required by state law and requirements may vary based on the individual project conditions. For most construction contracts over $10,000, the contractor is required to provide proof of insurance before authorization is granted to proceed with the work.

Plan deposits

Plan deposits are normally not required.

TPWD: Bid Opportunities - Construction

E-mail

You may download plans and specs directly from our website through the TPWD: Bid Opportunities - Construction page. If necessary, email requests for plans and specs to contracting@tpwd.state.tx.us (be sure to include your phone and fax numbers) or you may contact us by phone at 512-389-4442. You should receive your requests within 5 working days from the date your request is received.

Key Staff and Contact Information

Region/Office Address Phone Staff Contact
Division Office Infrastructure Division
Texas Parks and Wildlife Department
4200 Smith School Road
Austin, Texas 78744
   
Infrastructure Director Same as above 512-389-4741 Rich McMonagle
Deputy Director Same as above 512-389-4849 Scott Stover
Administration/Finance Same as above 512-389-4930 Joseph Molis
Project Management Same as above 512-389-8628 Jessica Davisson
Planning and Design Same as above 512-389-8603 Gordon Bohmfalk
Field Operations Same as above 512-389-4346 Scott Smith
Contracting Same as above 512-389-4944 Teresa Rodgers-Curtis
Support Services Same as above 512-389-8089 Steve Schroeter

Back to Top
Back to Top